PropellerAds Porous Concrete :Which can absorb 4000lts of water in 60sec Skip to main content

Porous Concrete :Which can absorb 4000lts of water in 60sec

Flash flooding is more dangerous than you might think: experts warn that a mere six inches of fast-moving water can knock you off of your feet. It's no wonder, then, that flash flooding is routinely one of the leading causes of weather-related deaths in the United States.

A British firm recently unveiled technology that could help mitigate some of the dangers of flooding, especially on roadways. Designed by sustainable building company Tarmac, Topmix Permeable is an absorptive concrete pavement capable of soaking up more than 800 gallons of water each minute:

Topmix can help rapidly remove water from roadways, preventing the potentially dangerous buildup of standing water. As it is absorbed, stormwater is filtered through a porous layer of pebbles, removing petroleum hydrocarbons and other pollutants commonly found on roadways before the water is ultimately returned to the water table.
"Being able to control and actively manage the drainage of rainwater from the developed landscape significantly reduces the risk of surface water flooding, protecting both the natural and built environment," the company explains on its website.

Interestingly, Topmix can also help mitigate the urban Heat Island Effect: because of the pores within its structure, the pavement cannot retain as much heat as traditional asphalt. Furthermore, water evaporating from the pavement's pores can have a cooling effect on the immediate area.
The technology isn't quite ready for wide-scale deployment. Tarmac notes that the permeable surface is prone to damage from freezing water and therefore not suitable for use in subzero temperatures. Furthermore, the product is not suitable for use on high-volume roadways that bear heavy loads, although it can be used on shoulder lanes, residential streets, pedestrian and bike paths and parking lots.


Source
Discovery
Science alerts
Tarmac

Comments

Popular posts from this blog

Design, Construction & Structural Details of Burj Khalifa

The goal of the  Burj Dubai  Tower is not simply to be the world's highest building: it's to embody the world's highest aspirations. The superstructure has reached over 165 stories. The final height of the building is 2,717 feet (828 meters). The height of the multi-use skyscraper has "comfortably" exceed the previous record holder, the 509 meter (1671 ft) tall Taipei 101. The 280,000 m 2  (3,000,000 ft 2 ) reinforced concrete multi-use Burj Dubai tower is utilized for retail, a  Giorgio Armani  Hotel, residential and office. As with all super-tall projects, difficult structural engineering problems needed to be addressed and resolved. Structural System Description Burj Khalifa  has "refuge floors" at 25 to 30 story intervals that are more  fire resistant  and have separate air supplies in case of emergency. Its reinforced concrete structure makes it stronger than steel-frame skyscrapers. Designers purposely shaped the st...

Facts of Circular Building-Aldar HQ

1.Aldar headquarters is a first of its kind with circular structure Located at Al Rahan, Abu dhabi, UAE. 2. Height of building is around 110mts with a floor area of 61900 m2 3. The ground of the Aldar HQ was designed around Golden ratio 4.  The distinctive building was voted the “Best Futuristic Design” by The Building Exchange (BEX) Conference held in  Spain .   5.  The shape of this building is achieved through the use of structural diagrid, a diagonal grid of steel. Source : Google & Wikepedia

world's longest cable-stayed bridge-Russky Island, Russia

1. The bridge to Russky Island is the world's longest cable-stayed bridge, with a 1104 m long central span. 2. The bridge also has the second highest pylons after the Millau Viaduct and the longest cable stays. 3. The design of the bridge crossing has been determined on the basis of two primary factors: Shortest coast-to-coast distance in the bridge crossing location 1460 m. Navigable channel depth is up to 50 m. The locality of the bridge crossing construction site is characterized by severe climate conditions: temperatures vary from -31 °C to 37 °C; storms bring winds of up to 36 m/s and waves of up to 6 m in height; and ice formations in winter can be up to 70 cm thick. Total Length : 3100meters Width : 29.5m Height : 320.9m Longest Span  : 1104m Clearence  Above : 70m Building  Cost : $1.1 billionUSD Opened : 2012 Source : Wikepedia, Google